This month, the U.S. government imposed new tariffs, doubling rates on imported steel to 50%. These tariffs may potentially put significant strain on supply chains and escalate costs across the construction industry, including hospitals, pharmaceutical facilities, and other regulated sectors planning new builds or facility upgrades.
Modular Devices gives your organization a smart, fast, cost-effective, and flexible way to maintain operations—without waiting for delays to resolve.
Why Modular Cleanrooms and Mobile Imaging Units are Ideal During Construction Delays
Modular Devices offers turnkey, code-compliant solutions specifically designed to bridge gaps caused by construction setbacks, supply shortages, and emergency outages.
• Rapid Deployment: Delivered and installed in as little as days; not months
• Regulatory Compliance: Built to USP <797>/<800>, USP <825>, cGMP, and healthcare imaging standards
• Minimal Site Disruption: Factory-built and tested before delivery
• Flexible Leasing or Purchase Options: Cost-effective for both temporary and long-term needs
Applications Across Regulated Industries
Our imaging and cleanroom solutions are trusted by:
• Hospitals in need of Cath, MRI, or CT capacity
• Compounding pharmacies seeking compliant space
• Biotech, radiopharmaceutical, and life sciences innovators with expanding footprints
• Chemical and industrial facilities requiring clean manufacturing environments
Made in the USA
All Modular Devices systems are manufactured in the United States using primarily US-sourced materials. This domestic manufacturing base allows us to deliver consistent quality while avoiding international supply chain risks, delays, and cost increases.
Take Action Today
Don’t let material shortages or delayed construction halt your operations. Contact Modular Devices to learn more about our mobile imaging units and modular cleanrooms.