13.6.2025

Modular Cleanroom and Imaging Solutions for Construction Delays

This month, the U.S. government imposed new tariffs, doubling rates on imported steel to 50%. These tariffs may potentially put significant strain on supply chains and escalate costs across the construction industry, including hospitals, pharmaceutical facilities, and other regulated sectors planning new builds or facility upgrades.

Modular Devices gives your organization a smart, fast, cost-effective, and flexible way to maintain operations—without waiting for delays to resolve.

Why Modular Cleanrooms and Mobile Imaging Units are Ideal During Construction Delays

Modular Devices offers turnkey, code-compliant solutions specifically designed to bridge gaps caused by construction setbacks, supply shortages, and emergency outages.

• Rapid Deployment: Delivered and installed in as little as days; not months

• Regulatory Compliance: Built to USP <797>/<800>, USP <825>, cGMP, and healthcare imaging standards

• Minimal Site Disruption: Factory-built and tested before delivery

• Flexible Leasing or Purchase Options: Cost-effective for both temporary and long-term needs

Applications Across Regulated Industries

Our imaging and cleanroom solutions are trusted by:

• Hospitals in need of Cath, MRI, or CT capacity

• Compounding pharmacies seeking compliant space

• Biotech, radiopharmaceutical, and life sciences innovators with expanding footprints

• Chemical and industrial facilities requiring clean manufacturing environments

Made in the USA

All Modular Devices systems are manufactured in the United States using primarily US-sourced materials. This domestic manufacturing base allows us to deliver consistent quality while avoiding international supply chain risks, delays, and cost increases.

Take Action Today

Don’t let material shortages or delayed construction halt your operations. Contact Modular Devices to learn more about our mobile imaging units and modular cleanrooms.

Two brands.
One philosophy.

Modular Devices is a leading provider of mobile and modular imaging labs and cleanroom solutions, serving hospitals, surgery centers, compounding pharmacies, and life sciences organizations across the U.S.

Our turnkey Mobile Cath Labs, Modular EP Labs, Mobile MRI and CT Scanners are designed for rapid deployment and clinical precision. In parallel, our USP 797 and USP 800-compliant Mobile Cleanrooms and Modular cGMP Cleanrooms offer flexible, regulatory-ready environments for pharmaceutical compounding, biotech research, and sterile manufacturing. With nationwide delivery, expert support, and customizable configurations, we help healthcare and life sciences teams maintain continuity, compliance, and care—without compromise.

Specializing in Mobile Cath Labs, Modular Devices is the leading provider of Cath/IR/EP, MR and CT solutions available for short and long-term lease.

Leases and sells pre-engineered, pre-built mobile cleanrooms delivered fully assembled and ready to use when delivered.